| Assessment Year | 1992 |
|---|---|
| Principal Product | CAPACITORS |
| NAICS |
n/a
|
| SIC | 3675: Electronic Capacitors |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 4,500,000
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,507 | 1,588,511 |
kWh
|
$0.068 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $95 |
$257
3,810
kWh
|
$(-28.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,819 | $16,774 |
$4,819
71,219
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $80 | $1,598 |
$80
1,172
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $114 | - |
$114
1,758
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $428 | $300 |
$428
6,448
kWh
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,572 | - |
$2,572
38,101
kWh
|
- | |
| 07 | 2.7261: Install timers and/or thermostats | $3,843 | $1,600 |
$3,843
56,858
kWh
|
- | |
| 08 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $714 | $1,800 |
$714
10,551
kWh
|
- | |
| 09 | 2.7226: Use computer programs to optimize hvac performance | $3,692 | $5,400 |
$3,692
54,513
kWh
|
- | |
| TOTAL RECOMMENDED | $16,491 | $27,567 |
$16,519
244,430
kWh
|
$(-28.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs