ITAC Assessment: MA0054
ITAC logo
ITAC Assessment: MA0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MECHANICAL RUBBER GOODS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,082 674,091
kWh
Fuel Oil #4 $46,653 8,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.2136: Install / repair insulation on steam lines $730 $1,200 - $730
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $1,260 $600 - $1,260
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $676 - - $676
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $811 - $811
6,741
kWh
-
TOTAL RECOMMENDED $3,477 $1,800 $811
6,741
kWh
$2,666
-
MMBtu
TOTAL IMPLEMENTED $3,477 $1,800 $811
6,741
kWh
$2,666
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs