Assessment Year | 1992 |
---|---|
Principal Product | INTEGRATED CIRCUIT CHIPS |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 390 |
Plant Area |
n/a
|
Annual Production | 260,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,798 | 5,002,052 |
kWh
|
$0.061 |
Natural Gas | $5,556 | 939 |
MMBtu
|
$5.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,721 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $14,714 | $20,000 |
$14,714
326,788
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,923 | $800 |
$4,923
80,598
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $451 | $1,804 |
$451
7,327
kWh
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $556 | $200 |
$556
9,086
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,850 | $1,755 |
$8,469
138,628
kWh
|
$(-2,619.0)
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,835 | $30,355 |
$5,670
92,614
kWh
|
- | $(-835.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $369 | $380 |
$369
6,155
kWh
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $18,840 | $50,250 |
$18,840
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $50,538 | $105,544 |
$53,992
661,196
kWh
|
$(-2,619.0)
-
MMBtu
|
$(-835.0) | ||
TOTAL IMPLEMENTED | $15,721 | $22,004 |
$15,721
343,201
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs