ITAC Assessment: AS0047
ITAC logo
ITAC Assessment: AS0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product INTEGRATED CIRCUIT CHIPS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 390
Plant Area
n/a
Annual Production 260,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,798 5,002,052
kWh
Natural Gas $5,556 939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $14,714 $20,000 $14,714
326,788
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,923 $800 $4,923
80,598
kWh
- -
03 2.4133: Use most efficient type of electric motors $451 $1,804 $451
7,327
kWh
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $556 $200 $556
9,086
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,850 $1,755 $8,469
138,628
kWh
$(-2,619.0)
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,835 $30,355 $5,670
92,614
kWh
- $(-835.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $369 $380 $369
6,155
kWh
- -
08 2.8114: Change rate schedules or other changes in utility service $18,840 $50,250 $18,840
-
kWh
- -
TOTAL RECOMMENDED $50,538 $105,544 $53,992
661,196
kWh
$(-2,619.0)
-
MMBtu
$(-835.0)
TOTAL IMPLEMENTED $15,721 $22,004 $15,721
343,201
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs