| Assessment Year | 1991 |
|---|---|
| Principal Product | CUSTOM BOLTS |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $1 M to 5M |
| # of Employees | 41 |
| Plant Area |
n/a
|
| Annual Production | 300,000
lb
|
| Production Hrs. Annual | 4,212
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $101,687 | 1,140,973 |
kWh
|
$0.089 |
| Natural Gas | $32,010 | 6,842 |
MMBtu
|
$4.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $6,490 | $35,000 |
$6,490
-
kWh
|
|
| 02 | 2.4323: Use optimum size and capacity equipment | $4,531 | $1,000 |
$4,531
50,996
kWh
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $240 | $200 |
$240
2,638
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,175 | $300 |
$3,175
35,756
kWh
|
|
| 05 | 2.4312: Improve lubrication practices | $392 | - |
$392
4,396
kWh
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $261 | $663 |
$261
2,931
kWh
|
|
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $187 | - |
$187
2,052
kWh
|
|
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $496 | $3,190 |
$496
5,569
kWh
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $397 | $30 |
$397
4,396
kWh
|
|
| 10 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $315 | $100 |
$315
3,517
kWh
|
|
| TOTAL RECOMMENDED | $16,484 | $40,483 |
$16,484
112,251
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs