Assessment Year | 1991 |
---|---|
Principal Product | CUSTOM BOLTS |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $1 M to 5M |
# of Employees | 41 |
Plant Area |
n/a
|
Annual Production | 300,000
lb
|
Production Hrs. Annual | 4,212
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,687 | 1,140,973 |
kWh
|
$0.089 |
Natural Gas | $32,010 | 6,842 |
MMBtu
|
$4.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $6,490 | $35,000 |
$6,490
-
kWh
|
|
02 | 2.4323: Use optimum size and capacity equipment | $4,531 | $1,000 |
$4,531
50,996
kWh
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $240 | $200 |
$240
2,638
kWh
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,175 | $300 |
$3,175
35,756
kWh
|
|
05 | 2.4312: Improve lubrication practices | $392 | - |
$392
4,396
kWh
|
|
06 | 2.4133: Use most efficient type of electric motors | $261 | $663 |
$261
2,931
kWh
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $187 | - |
$187
2,052
kWh
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $496 | $3,190 |
$496
5,569
kWh
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $397 | $30 |
$397
4,396
kWh
|
|
10 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $315 | $100 |
$315
3,517
kWh
|
|
TOTAL RECOMMENDED | $16,484 | $40,483 |
$16,484
112,251
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs