ITAC Assessment: AS0034
ITAC logo
ITAC Assessment: AS0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 720,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,553 4,008,499
kWh
Natural Gas $258,748 59,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $219,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $175,405 - $265,373
4,057,151
kWh
$(-89,968.0)
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $12,714 $1,000 - $12,714
-
MMBtu
03 2.1221: Replace obsolete burners with more efficient ones $4,459 $100,000 - $4,459
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $648 $796 - $648
-
MMBtu
05 2.2511: Insulate bare equipment $9,504 $1,290 - $9,504
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,368 $356 $5,368
82,063
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $831 $935 $831
12,603
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,428 $300 $4,428
67,702
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,445 - $2,445
37,515
kWh
-
10 2.6231: Utilize controls to operate equipment only when needed $2,496 $190 $2,496
38,101
kWh
-
11 2.4133: Use most efficient type of electric motors $343 $595 $343
5,275
kWh
-
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $459 - $459
7,034
kWh
-
TOTAL RECOMMENDED $219,100 $105,462 $281,743
4,307,444
kWh
$(-62,643.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs