| Assessment Year | 1991 |
|---|---|
| Principal Product | TEMPERED GLASS |
| NAICS |
n/a
|
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $1 M to 5M |
| # of Employees | 32 |
| Plant Area |
n/a
|
| Annual Production | 1
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $156,636 | 2,066,530 |
kWh
|
$0.076 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $413 | $1,555 |
$413
5,569
kWh
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,793 | - |
$3,793
50,117
kWh
|
|
| 03 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $5,048 | $1,000 |
$5,048
66,530
kWh
|
|
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,878 | $1,200 |
$1,878
24,912
kWh
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,428 | $1,100 |
$1,428
18,757
kWh
|
|
| TOTAL RECOMMENDED | $12,560 | $4,855 |
$12,560
165,885
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs