ITAC Assessment: AS0015
ITAC logo
ITAC Assessment: AS0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COOLERS AND HEATERS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 495
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,080
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $753,309 9,308,910
kWh
Natural Gas $208,988 49,631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,956 $1,000 $18,956
234,467
kWh
-
02 2.4133: Use most efficient type of electric motors $2,924 $4,119 $2,924
36,049
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,814 - $6,814
84,115
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,240 $808 $5,240
64,771
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $20,041 - $20,041
247,655
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,214 $520 $2,214
27,257
kWh
-
07 2.7123: Keep lamps and reflectors clean $15,919 $20,225 $15,919
196,659
kWh
-
08 2.6232: Install set-back timers $1,698 $450 $1,698
21,102
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,119 $2,775 $1,119
13,775
kWh
-
10 2.2437: Recover waste heat from equipment $2,463 $1,760 - $2,463
-
MMBtu
TOTAL RECOMMENDED $77,388 $31,657 $74,925
925,850
kWh
$2,463
-
MMBtu
TOTAL IMPLEMENTED $66,352 $25,794 $66,352
820,047
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs