| Assessment Year | 1990 |
|---|---|
| Principal Product | COOLERS AND HEATERS |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 495 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $753,309 | 9,308,910 |
kWh
|
$0.081 |
| Natural Gas | $208,988 | 49,631 |
MMBtu
|
$4.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $77,388 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,352 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,956 | $1,000 |
$18,956
234,467
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,924 | $4,119 |
$2,924
36,049
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,814 | - |
$6,814
84,115
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,240 | $808 |
$5,240
64,771
kWh
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $20,041 | - |
$20,041
247,655
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,214 | $520 |
$2,214
27,257
kWh
|
- | |
| 07 | 2.7123: Keep lamps and reflectors clean | $15,919 | $20,225 |
$15,919
196,659
kWh
|
- | |
| 08 | 2.6232: Install set-back timers | $1,698 | $450 |
$1,698
21,102
kWh
|
- | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,119 | $2,775 |
$1,119
13,775
kWh
|
- | |
| 10 | 2.2437: Recover waste heat from equipment | $2,463 | $1,760 | - |
$2,463
-
MMBtu
|
|
| TOTAL RECOMMENDED | $77,388 | $31,657 |
$74,925
925,850
kWh
|
$2,463
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $66,352 | $25,794 |
$66,352
820,047
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs