| Assessment Year | 1990 |
|---|---|
| Principal Product | ALUMINUM WINDOWS & DOORS |
| NAICS |
n/a
|
| SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
| Sales Range | $10 M to 50M |
| # of Employees | 527 |
| Plant Area |
n/a
|
| Annual Production | 1,200,000
pieces
|
| Production Hrs. Annual | 7,116
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $447,336 | 6,264,068 |
kWh
|
$0.071 |
| Natural Gas | $94,064 | 25,796 |
MMBtu
|
$3.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $53,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,348 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,459 | - |
$1,459
20,516
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $591 | $758 |
$591
8,499
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $3,149 | $261 |
$3,149
44,549
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $7,665 | $2,474 | - |
$7,665
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,125 | $2,587 |
$1,125
15,826
kWh
|
- | |
| 06 | 2.7123: Keep lamps and reflectors clean | $17,065 | $13,365 |
$17,065
240,914
kWh
|
- | |
| 07 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $16,359 | $6,000 |
$16,359
230,950
kWh
|
- | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $5,640 | $1,000 |
$5,640
79,719
kWh
|
- | |
| TOTAL RECOMMENDED | $53,053 | $26,445 |
$45,388
640,973
kWh
|
$7,665
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $30,348 | $12,080 |
$22,683
320,340
kWh
|
$7,665
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs