ITAC Assessment: AS0002
ITAC logo
ITAC Assessment: AS0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product POTATO AND CORN CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 36,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,532 7,252,931
kWh
Natural Gas $396,317 161,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $317,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $281,965 $1,050,000 $361,455
5,562,720
kWh
$(-79,490.0)
-
MMBtu
02 2.1212: Operate boilers on high fire setting $18,029 $100,000 - $18,029
-
MMBtu
03 2.6232: Install set-back timers $7,055 $3,521 $7,055
109,613
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $4,653 $1,000 $4,653
71,512
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,704 $2,813 $2,704
38,980
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $262 $335 $262
4,103
kWh
-
07 2.4133: Use most efficient type of electric motors $343 $427 $343
5,275
kWh
-
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,815 $1,530 - $1,815
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $390 $1,300 $390
5,862
kWh
-
TOTAL RECOMMENDED $317,216 $1,160,926 $376,862
5,798,065
kWh
$(-59,646.0)
-
MMBtu
TOTAL IMPLEMENTED $33,174 $109,061 $15,145
231,242
kWh
$18,029
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs