| Assessment Year | 1990 |
|---|---|
| Principal Product | POTATO AND CORN CHIPS |
| NAICS |
n/a
|
| SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 36,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $484,532 | 7,252,931 |
kWh
|
$0.067 |
| Natural Gas | $396,317 | 161,366 |
MMBtu
|
$2.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $317,216 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,174 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $281,965 | $1,050,000 |
$361,455
5,562,720
kWh
|
$(-79,490.0)
-
MMBtu
|
|
| 02 | 2.1212: Operate boilers on high fire setting | $18,029 | $100,000 | - |
$18,029
-
MMBtu
|
|
| 03 | 2.6232: Install set-back timers | $7,055 | $3,521 |
$7,055
109,613
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $4,653 | $1,000 |
$4,653
71,512
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,704 | $2,813 |
$2,704
38,980
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $262 | $335 |
$262
4,103
kWh
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $343 | $427 |
$343
5,275
kWh
|
- | |
| 08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,815 | $1,530 | - |
$1,815
-
MMBtu
|
|
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $390 | $1,300 |
$390
5,862
kWh
|
- | |
| TOTAL RECOMMENDED | $317,216 | $1,160,926 |
$376,862
5,798,065
kWh
|
$(-59,646.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $33,174 | $109,061 |
$15,145
231,242
kWh
|
$18,029
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs