ITAC Assessment: AS0001
ITAC logo
ITAC Assessment: AS0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLASTIC BOTTLES
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area
n/a
Annual Production 111,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $797,745 14,269,930
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $895 $1,483 $895
16,120
kWh
02 2.4221: Install compressor air intakes in coolest locations $3,168 $500 $3,168
56,858
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,710 - $2,710
48,652
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,289 $656 $2,289
41,032
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,764 $1,440 $1,764
31,653
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $882 $1,800 $882
15,826
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $717 $250 $717
12,896
kWh
TOTAL RECOMMENDED $12,425 $6,129 $12,425
223,037
kWh
TOTAL IMPLEMENTED $10,136 $5,473 $10,136
182,005
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs