ITAC Assessment: AR0190
ITAC logo
ITAC Assessment: AR0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Electrical wiring and cables
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 35,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,652 947,245
kWh
Electricity Demand $21,321 2,894
kW-mo/yr
Natural Gas $5,631 1,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $251,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $250,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $235 $75 $98
2,931
kWh
$137
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $551 - $100
2,931
kWh
$451
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $1,150 $1,950 - $1,150
-
kW-mo/yr
-
04 4.514: Re-arrange equipment layout to reduce handling costs $249,600 $6,949 - - $249,600
TOTAL RECOMMENDED $251,536 $8,974 $198
5,862
kWh
$1,738
-
kW-mo/yr
$249,600
TOTAL IMPLEMENTED $250,386 $7,024 $198
5,862
kWh
$588
-
kW-mo/yr
$249,600
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs