ITAC Assessment: GT0341
ITAC logo
ITAC Assessment: GT0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ENGINE HEAD GASKETS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,754 5,211,020
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $360 $550 $360
15,826
kWh
02 2.7314: Reduce ventilation air $2,230 $400 $2,230
85,873
kWh
03 2.2614: Use cooling tower or economizer to replace chiller cooling $1,170 $760 $1,170
29,894
kWh
04 2.7123: Keep lamps and reflectors clean $1,730 $3,720 $1,730
47,186
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $480 $460 $480
20,809
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $111 $112 $111
1,465
kWh
07 2.3191: Use demand controller or load shedder $5,850 $400 $5,850
-
kWh
TOTAL RECOMMENDED $11,931 $6,402 $11,931
201,053
kWh
TOTAL IMPLEMENTED $8,440 $1,350 $8,440
101,699
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs