Assessment Year | 1999 |
---|---|
Principal Product | Steel Tubing |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
500,000
ft2
|
Annual Production | 85,995
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $899,156 | 31,893,318 |
kWh
|
$0.028 |
Electricity Demand | $816,378 | 82,028 |
kW-mo/yr
|
$9.95 |
Natural Gas | $212,057 | 57,571 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,786 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $693 | $807 |
$474
16,999
kWh
|
$219
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $230 | - |
$157
5,569
kWh
|
$73
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,414 | $800 |
$15,573
468,347
kWh
|
$6,841
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $21,142 | $630 |
$13,739
490,621
kWh
|
$7,403
-
kW-mo/yr
|
- | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $27,540 | $1,000 | - | - | $27,540 | |
TOTAL RECOMMENDED | $72,019 | $3,237 |
$29,943
981,536
kWh
|
$14,536
-
kW-mo/yr
|
$27,540 | ||
TOTAL IMPLEMENTED | $43,786 | $1,430 |
$29,469
964,537
kWh
|
$14,317
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs