Assessment Year | 1999 |
---|---|
Principal Product | Gas valves |
NAICS |
n/a
|
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 349 |
Plant Area |
142,618
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $256,325 | 10,296,307 |
kWh
|
$0.025 |
Electricity Demand | $236,312 | 20,135 |
kW-mo/yr
|
$11.74 |
Natural Gas | $22,401 | 4,195 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,042 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,102 | $270 |
$1,113
44,549
kWh
|
$989
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $636 | $952 |
$323
12,896
kWh
|
$313
-
kW-mo/yr
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $3,144 | $3,881 |
$1,664
83,236
kWh
|
$1,480
-
kW-mo/yr
|
- | - | - | |
04 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $27,490 | $5,600 | - | - |
$25,825
-
gal
|
$1,665
-
lb
|
- | |
05 | 4.513: Re-arrange equipment layout to reduce labor costs | $29,203 | - | - | - | - | - | $29,203 | |
06 | 3.2176: Increase use of automation | $29,203 | $25,000 | - | - | - | - | $29,203 | |
TOTAL RECOMMENDED | $91,778 | $35,703 |
$3,100
140,681
kWh
|
$2,782
-
kW-mo/yr
|
$25,825
-
gal
|
$1,665
-
lb
|
$58,406 | ||
TOTAL IMPLEMENTED | $59,042 | $25,952 |
$323
12,896
kWh
|
$313
-
kW-mo/yr
|
- | - | $58,406 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs