ITAC Assessment: AR0151
ITAC logo
ITAC Assessment: AR0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Industrial Valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 146,350
ft2
Annual Production 28,800
pieces
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,768 3,780,774
kWh
Electricity Demand $46,063 8,858
kW-mo/yr
Natural Gas $52,964 9,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,881 $200 $1,324
41,325
kWh
$557
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $602 $400 $429
13,482
kWh
$173
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,208 $17,401 $4,912
153,576
kWh
$2,296
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $413 $1,107 $256
7,913
kWh
$157
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $716 - $438
13,775
kWh
$278
-
kW-mo/yr
- -
06 3.8142: Distill contaminated solvents for reuse $2,894 $6,000 $(-55.0)
(-1,758)
kWh
$(-51.0)
-
kW-mo/yr
$3,000
-
gal
-
07 4.513: Re-arrange equipment layout to reduce labor costs $11,422 $2,500 - - - $11,422
TOTAL RECOMMENDED $25,136 $27,608 $7,304
228,313
kWh
$3,410
-
kW-mo/yr
$3,000
-
gal
$11,422
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs