| Assessment Year | 1998 |
|---|---|
| Principal Product | Industrial Valves |
| NAICS |
n/a
|
| SIC | 3491: Industrial Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 86 |
| Plant Area |
146,350
ft2
|
| Annual Production | 28,800
pieces
|
| Production Hrs. Annual | 4,171
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $120,768 | 3,780,774 |
kWh
|
$0.032 |
| Electricity Demand | $46,063 | 8,858 |
kW-mo/yr
|
$5.20 |
| Natural Gas | $52,964 | 9,799 |
MMBtu
|
$5.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,136 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,881 | $200 |
$1,324
41,325
kWh
|
$557
-
kW-mo/yr
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $602 | $400 |
$429
13,482
kWh
|
$173
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,208 | $17,401 |
$4,912
153,576
kWh
|
$2,296
-
kW-mo/yr
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $413 | $1,107 |
$256
7,913
kWh
|
$157
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $716 | - |
$438
13,775
kWh
|
$278
-
kW-mo/yr
|
- | - | |
| 06 | 3.8142: Distill contaminated solvents for reuse | $2,894 | $6,000 |
$(-55.0)
(-1,758)
kWh
|
$(-51.0)
-
kW-mo/yr
|
$3,000
-
gal
|
- | |
| 07 | 4.513: Re-arrange equipment layout to reduce labor costs | $11,422 | $2,500 | - | - | - | $11,422 | |
| TOTAL RECOMMENDED | $25,136 | $27,608 |
$7,304
228,313
kWh
|
$3,410
-
kW-mo/yr
|
$3,000
-
gal
|
$11,422 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs