ITAC Assessment: AR0134
ITAC logo
ITAC Assessment: AR0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Milled Rice
NAICS
n/a
SIC 2044: Rice Milling
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 43,300
ft2
Annual Production 440,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,219 9,228,898
kWh
Electricity Demand $131,037 18,643
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $352 $228 $229
6,448
kWh
$123
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,071 $180 $651
18,171
kWh
$420
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,183 - $7,252
201,348
kWh
$1,931
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $3,301 $23,460 $2,614
72,685
kWh
$687
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,050 $360 $846
23,447
kWh
$204
-
kW-mo/yr
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $119 - - - $119
-
lb
-
07 4.651: Install back-up equipment $88,000 $75,000 - - - $88,000
08 4.423: Move product using mechanical means $52,140 $3,000 - - - $52,140
TOTAL RECOMMENDED $155,216 $102,228 $11,592
322,099
kWh
$3,365
-
kW-mo/yr
$119
-
lb
$140,140
TOTAL IMPLEMENTED $63,915 $3,768 $8,978
249,414
kWh
$2,678
-
kW-mo/yr
$119
-
lb
$52,140
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs