Assessment Year | 1998 |
---|---|
Principal Product | Milled Rice |
NAICS |
n/a
|
SIC | 2044: Rice Milling |
Sales Range | $5 M to 10M |
# of Employees | 53 |
Plant Area |
43,300
ft2
|
Annual Production | 440,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $332,219 | 9,228,898 |
kWh
|
$0.036 |
Electricity Demand | $131,037 | 18,643 |
kW-mo/yr
|
$7.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,216 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,915 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $352 | $228 |
$229
6,448
kWh
|
$123
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,071 | $180 |
$651
18,171
kWh
|
$420
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,183 | - |
$7,252
201,348
kWh
|
$1,931
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $3,301 | $23,460 |
$2,614
72,685
kWh
|
$687
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,050 | $360 |
$846
23,447
kWh
|
$204
-
kW-mo/yr
|
- | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $119 | - | - | - |
$119
-
lb
|
- | |
07 | 4.651: Install back-up equipment | $88,000 | $75,000 | - | - | - | $88,000 | |
08 | 4.423: Move product using mechanical means | $52,140 | $3,000 | - | - | - | $52,140 | |
TOTAL RECOMMENDED | $155,216 | $102,228 |
$11,592
322,099
kWh
|
$3,365
-
kW-mo/yr
|
$119
-
lb
|
$140,140 | ||
TOTAL IMPLEMENTED | $63,915 | $3,768 |
$8,978
249,414
kWh
|
$2,678
-
kW-mo/yr
|
$119
-
lb
|
$52,140 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs