| Assessment Year | 1998 |
|---|---|
| Principal Product | Industrial Cleaning Equipment |
| NAICS |
n/a
|
| SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
230,000
ft2
|
| Annual Production | 116,000
pieces
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,803 | 2,927,608 |
kWh
|
$0.035 |
| Electricity Demand | $51,833 | 8,869 |
kW-mo/yr
|
$5.84 |
| Natural Gas | $85,672 | 18,191 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $136,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $114,071 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $2,372 | $186 |
$1,304
37,222
kWh
|
$1,068
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $4,289 | $2,535 | - | - |
$4,289
-
MMBtu
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,680 | $350 |
$1,127
32,239
kWh
|
$553
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $357 | $2,695 |
$357
10,258
kWh
|
- | - | - | - | - | |
| 05 | 3.4115: Recover and reuse cooling water | $13,814 | $6,800 |
$(-319.0)
(-6,155)
kWh
|
- | - |
$14,133
-
Tgal
|
- | - | |
| 06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,029 | - |
$(-52.0)
(-293)
kWh
|
- | - | - |
$2,426
-
lb
|
$(-345.0) | |
| 07 | 4.423: Move product using mechanical means | $112,042 | $118,598 |
$(-10,358.0)
(-144,490)
kWh
|
- | - | - | - | $122,400 | |
| TOTAL RECOMMENDED | $136,583 | $131,164 |
$(-7,941.0)
(-71,219)
kWh
|
$1,621
-
kW-mo/yr
|
$4,289
-
MMBtu
|
$14,133
-
Tgal
|
$2,426
-
lb
|
$122,055 | ||
| TOTAL IMPLEMENTED | $114,071 | $118,598 |
$(-10,410.0)
(-144,783)
kWh
|
- | - | - |
$2,426
-
lb
|
$122,055 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs