ITAC Assessment: AR0132
ITAC logo
ITAC Assessment: AR0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Custom Store Display Fixtures
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 137,167
ft2
Annual Production 800
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,631 1,288,687
kWh
Electricity Demand $25,732 4,078
kW-mo/yr
Natural Gas $23,418 4,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,006 $320 $975
29,601
kWh
$1,031
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $227 $150 $110
3,224
kWh
$117
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,278 - $621
18,757
kWh
$657
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $10,614 $8,000 $(-148.0)
(-1,758)
kWh
- $12,721
-
lb
$(-1,959.0) -
05 3.5313: Increase amount of waste recovered for resale $7,249 $44,000 $(-3,043.0)
(-28,136)
kWh
- $35,663
-
lb
$(-4,151.0) $(-21,220.0)
06 4.652: Replace existing equipment with more suitable substitutes $59,006 $40,400 $(-397.0)
(-6,448)
kWh
- - $59,403 -
TOTAL RECOMMENDED $80,380 $92,870 $(-1,882.0)
15,240
kWh
$1,805
-
kW-mo/yr
$48,384
-
lb
$53,293 $(-21,220.0)
TOTAL IMPLEMENTED $3,511 $470 $1,706
51,582
kWh
$1,805
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs