ITAC Assessment: AR0131
ITAC logo
ITAC Assessment: AR0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wood Pallets
NAICS
n/a
SIC 2448: Wood Pallets and Skids
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 52,900
ft2
Annual Production 76,000,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,982 943,142
kWh
Electricity Demand $35,880 6,395
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,315 $269 $760
22,274
kWh
$555
-
kW-mo/yr
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,297 - $1,297
38,101
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,920 - $1,078
31,653
kWh
$842
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $393 $6,580 $222
6,448
kWh
$171
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $774 $90 $412
12,309
kWh
$362
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $7,882 $10,035 - $7,882
-
kW-mo/yr
- -
07 3.5313: Increase amount of waste recovered for resale $23,082 $44,000 $(-9,836.0)
(-35,463)
kWh
- $32,918
-
lb
-
08 4.442: Install magazines for temporary storage $63,000 $8,000 - - - $63,000
09 4.513: Re-arrange equipment layout to reduce labor costs $71,804 $19,800 $(-196.0)
(-3,517)
kWh
- - $72,000
TOTAL RECOMMENDED $171,467 $88,774 $(-6,263.0)
71,805
kWh
$9,812
-
kW-mo/yr
$32,918
-
lb
$135,000
TOTAL IMPLEMENTED $96,957 $63,890 $(-8,323.0)
11,430
kWh
$362
-
kW-mo/yr
$32,918
-
lb
$72,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs