ITAC Assessment: AR0119
ITAC logo
ITAC Assessment: AR0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Peanut Butter
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 143,000
ft2
Annual Production 127,000,000
lb
Production Hrs. Annual 6,497
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,995 16,415,006
kWh
Electricity Demand $592,302 33,750
kW-mo/yr
Natural Gas $114,906 32,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,438

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $20,039 $1,110 $20,039
360,492
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,439 $3,524 $2,439
7,913
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,961 - $2,961
59,789
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,406 $500 $1,406
36,635
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $907 $90 $907
23,740
kWh
- -
06 2.3136: Overlap custodial services with normal day hours $498 - $498
22,567
kWh
- -
07 3.5311: Recover and reuse waste material $48,811 $10,230 - $48,811
-
lb
-
08 3.5311: Recover and reuse waste material $20,099 $16,000 - $20,099
-
lb
-
09 4.652: Replace existing equipment with more suitable substitutes $4,032 $21,600 - - $4,032
TOTAL RECOMMENDED $101,192 $53,054 $28,250
511,136
kWh
$68,910
-
lb
$4,032
TOTAL IMPLEMENTED $30,438 $41,214 $6,307
91,442
kWh
$20,099
-
lb
$4,032
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs