Assessment Year | 1997 |
---|---|
Principal Product | Corrugated Shipping Containers |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 162 |
Plant Area |
205,000
ft2
|
Annual Production | 47,000
ton
|
Production Hrs. Annual | 6,882
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $204,969 | 6,473,623 |
kWh
|
$0.032 |
Electricity Demand | $221,056 | 15,650 |
kW-mo/yr
|
$14.12 |
Natural Gas | $195,329 | 64,870 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $160,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $110,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $13,260 | $2,130 |
$7,258
226,846
kWh
|
$6,002
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,221 | $2,950 |
$1,804
56,272
kWh
|
$1,417
-
kW-mo/yr
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $226 | - |
$124
3,810
kWh
|
$102
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,191 | $290 |
$3,499
109,027
kWh
|
$2,692
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,809 | $450 |
$953
29,894
kWh
|
$856
-
kW-mo/yr
|
- | - | - | |
06 | 2.2135: Repair and eliminate steam leaks | $885 | $180 | - | - |
$885
-
MMBtu
|
- | - | |
07 | 2.3212: Optimize plant power factor | $21,464 | $15,300 |
$21,464
449,004
kWh
|
- | - | - | - | |
08 | 2.3136: Overlap custodial services with normal day hours | $286 | - |
$286
8,499
kWh
|
- | - | - | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,429 | - | - | - | - |
$4,429
-
lb
|
- | |
10 | 3.5313: Increase amount of waste recovered for resale | $677 | - | - | - | - |
$677
-
lb
|
- | |
11 | 4.441: Install automatic packing equipment | $36,000 | $60,000 | - | - | - | - | $36,000 | |
12 | 4.513: Re-arrange equipment layout to reduce labor costs | $72,000 | $67,500 | - | - | - | - | $72,000 | |
TOTAL RECOMMENDED | $160,448 | $148,800 |
$35,388
883,352
kWh
|
$11,069
-
kW-mo/yr
|
$885
-
MMBtu
|
$5,106
-
lb
|
$108,000 | ||
TOTAL IMPLEMENTED | $110,902 | $86,670 |
$27,844
648,007
kWh
|
$5,067
-
kW-mo/yr
|
$885
-
MMBtu
|
$5,106
-
lb
|
$72,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs