ITAC Assessment: AR0113
ITAC logo
ITAC Assessment: AR0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Powder Metal Parts
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 69,000
ft2
Annual Production 15,600,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,211 6,792,790
kWh
Electricity Demand $227,466 12,535
kW-mo/yr
Natural Gas $14,825 3,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,936 $586 $698
27,843
kWh
$1,238
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $2,867 $1,286 $1,011
40,445
kWh
$1,856
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $5,687 $5,860 $2,357
94,373
kWh
$3,330
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,159 - $477
9,672
kWh
$682
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,010 $130 $506
19,930
kWh
$504
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,045 $100 $500
19,930
kWh
$545
-
kW-mo/yr
- - -
07 2.3212: Optimize plant power factor $28,836 $15,525 - $28,836
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $7,558 $3,000 $3,790
151,524
kWh
$3,768
-
kW-mo/yr
- - -
09 3.7221: Improve process control to prevent spills of material $45,450 $24,000 - - $45,450
-
lb
- -
10 3.7313: Eliminate oxygen loss $12,720 $95,000 - - - $12,720
-
lb
-
11 4.423: Move product using mechanical means $60,000 $8,200 - - - - $60,000
TOTAL RECOMMENDED $168,268 $153,687 $9,339
363,717
kWh
$40,759
-
kW-mo/yr
$45,450
-
lb
$12,720
-
lb
$60,000
TOTAL IMPLEMENTED $104,250 $32,715 $7,130
275,499
kWh
$37,120
-
kW-mo/yr
- - $60,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs