ITAC Assessment: AR0111
ITAC logo
ITAC Assessment: AR0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Sawmill Machinery
NAICS
n/a
SIC 3553: Woodworking Machinery
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 157,000
ft2
Annual Production 650
pieces
Production Hrs. Annual 5,344
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,710 1,946,659
kWh
Electricity Demand $92,832 6,908
kW-mo/yr
Natural Gas $15,755 3,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,354 $240 $1,247
35,463
kWh
$1,107
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,078 $3,090 $1,370
40,445
kWh
$1,708
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $988 - $431
12,603
kWh
$557
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $693 $50 $329
9,672
kWh
$364
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,779 $330 $1,006
32,239
kWh
$773
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $6,121 $4,140 - $6,121
-
kW-mo/yr
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $29,674 $6,000 - - $29,674
-
lb
-
08 3.5213: Reuse scrap printed paper for make-ready $7,118 $300 - - $7,118
-
lb
-
09 4.121: Maintain clean conditions before painting $4,760 $2,500 - - - $4,760
TOTAL RECOMMENDED $56,565 $16,650 $4,383
130,422
kWh
$10,630
-
kW-mo/yr
$36,792
-
lb
$4,760
TOTAL IMPLEMENTED $43,006 $13,800 $3,623
108,147
kWh
$9,709
-
kW-mo/yr
$29,674
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs