Assessment Year | 1997 |
---|---|
Principal Product | Sawmill Machinery |
NAICS |
n/a
|
SIC | 3553: Woodworking Machinery |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
157,000
ft2
|
Annual Production | 650
pieces
|
Production Hrs. Annual | 5,344
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,710 | 1,946,659 |
kWh
|
$0.034 |
Electricity Demand | $92,832 | 6,908 |
kW-mo/yr
|
$13.44 |
Natural Gas | $15,755 | 3,543 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,565 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,006 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,354 | $240 |
$1,247
35,463
kWh
|
$1,107
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,078 | $3,090 |
$1,370
40,445
kWh
|
$1,708
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $988 | - |
$431
12,603
kWh
|
$557
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $693 | $50 |
$329
9,672
kWh
|
$364
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,779 | $330 |
$1,006
32,239
kWh
|
$773
-
kW-mo/yr
|
- | - | |
06 | 2.3212: Optimize plant power factor | $6,121 | $4,140 | - |
$6,121
-
kW-mo/yr
|
- | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $29,674 | $6,000 | - | - |
$29,674
-
lb
|
- | |
08 | 3.5213: Reuse scrap printed paper for make-ready | $7,118 | $300 | - | - |
$7,118
-
lb
|
- | |
09 | 4.121: Maintain clean conditions before painting | $4,760 | $2,500 | - | - | - | $4,760 | |
TOTAL RECOMMENDED | $56,565 | $16,650 |
$4,383
130,422
kWh
|
$10,630
-
kW-mo/yr
|
$36,792
-
lb
|
$4,760 | ||
TOTAL IMPLEMENTED | $43,006 | $13,800 |
$3,623
108,147
kWh
|
$9,709
-
kW-mo/yr
|
$29,674
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs