ITAC Assessment: AR0108
ITAC logo
ITAC Assessment: AR0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Frictional Horsepawer Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 80,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 6,674
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,893 2,739,742
kWh
Electricity Demand $35,563 7,627
kW-mo/yr
Natural Gas $8,862 2,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,303 $415 $1,017
34,291
kWh
$286
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $560 $186 $416
11,723
kWh
$144
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $622 $270 $420
11,723
kWh
$202
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $469 $1,050 $348
4,396
kWh
$121
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $274 - $187
5,275
kWh
$87
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,231 $100 $5,054
140,973
kWh
$1,177
-
kW-mo/yr
- -
07 2.3136: Overlap custodial services with normal day hours $835 $100 $835
23,154
kWh
- - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $7,676 - - - $7,676
-
lb
-
09 3.5311: Recover and reuse waste material $2,070 $1,000 - - $2,070
-
lb
-
10 4.112: Replace old machine with new automatic multi-station tool $113,100 $30,000 - - - $113,100
TOTAL RECOMMENDED $133,140 $33,121 $8,277
231,535
kWh
$2,017
-
kW-mo/yr
$9,746
-
lb
$113,100
TOTAL IMPLEMENTED $130,235 $32,021 $7,442
208,381
kWh
$2,017
-
kW-mo/yr
$7,676
-
lb
$113,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings