ITAC Assessment: AR0106
ITAC logo
ITAC Assessment: AR0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Air Filtration Media
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 88,957
ft2
Annual Production 88,000,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,934 6,675,850
kWh
Electricity Demand $65,760 11,624
kW-mo/yr
Natural Gas $282,814 106,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,654 $690 $2,042
61,841
kWh
$612
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,804 $1,415 $2,128
64,478
kWh
$676
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $856 - $583
17,585
kWh
$273
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,478 $600 $1,927
58,324
kWh
$551
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,578 $350 $2,783
83,822
kWh
$795
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $10,942 $17,710 $8,131
246,190
kWh
$2,811
-
kW-mo/yr
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $853 - - - - $853
-
lb
-
08 3.4151: Minimize water usage $616 $100 - - $616
-
Tgal
- -
09 4.651: Install back-up equipment $60,000 $54,000 - - - - $60,000
TOTAL RECOMMENDED $84,781 $74,865 $17,594
532,240
kWh
$5,718
-
kW-mo/yr
$616
-
Tgal
$853
-
lb
$60,000
TOTAL IMPLEMENTED $10,508 $2,555 $7,536
227,726
kWh
$2,356
-
kW-mo/yr
$616
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs