Assessment Year | 2013 |
---|---|
Principal Product | Elevator cable |
NAICS | 335929: Other Communication and Energy Wire Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $50 M to 100M |
# of Employees | 106 |
Plant Area |
132,000
ft2
|
Annual Production | 18,400,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $318,682 | 5,410,539 |
kWh
|
$0.059 |
Electricity Demand | $207,447 | 11,610 |
kW-mo/yr
|
$17.87 |
Electricity Fees | $5,122 | - |
|
- |
Natural Gas | $22,998 | 1,944 |
MMBtu
|
$11.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,383 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $83,386 | $250,000 |
$4,672
80,000
kWh
|
$121,938
-
kW-mo/yr
|
- |
$(-28,224.0)
-
MMBtu
|
- | $(-15,000.0) | |
02 | 2.3192: Use fossil fuel powered generator during peak demand periods | $6,453 | $300 |
$196
3,360
kWh
|
$6,800
-
kW-mo/yr
|
$(-543.0)
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $627 | $100 |
$785
13,440
kWh
|
$442
-
kW-mo/yr
|
- | - | $(-400.0) | $(-200.0) | |
04 | 2.4239: Eliminate or reduce compressed air usage | $741 | $2,535 |
$474
8,121
kWh
|
$267
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $5,111 | $1,500 | - | - |
$5,111
-
MMBtu
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $323 | $600 |
$184
3,159
kWh
|
$139
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,980 | $19,622 |
$6,657
113,988
kWh
|
$3,753
-
kW-mo/yr
|
- | - | $(-795.0) | $(-3,635.0) | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $496 | - | - |
$496
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $103,117 | $274,657 |
$12,968
222,068
kWh
|
$133,835
-
kW-mo/yr
|
$4,568
-
MMBtu
|
$(-28,224.0)
-
MMBtu
|
$(-1,195.0) | $(-18,835.0) | ||
TOTAL IMPLEMENTED | $13,383 | $20,622 |
$7,822
133,947
kWh
|
$11,134
-
kW-mo/yr
|
$(-543.0)
-
MMBtu
|
- | $(-1,195.0) | $(-3,835.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs