ITAC Assessment: NC0488
ITAC logo
ITAC Assessment: NC0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Elevator cable
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 106
Plant Area 132,000
ft2
Annual Production 18,400,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,682 5,410,539
kWh
Electricity Demand $207,447 11,610
kW-mo/yr
Electricity Fees $5,122 -
Natural Gas $22,998 1,944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $83,386 $250,000 $4,672
80,000
kWh
$121,938
-
kW-mo/yr
- $(-28,224.0)
-
MMBtu
- $(-15,000.0)
02 2.3192: Use fossil fuel powered generator during peak demand periods $6,453 $300 $196
3,360
kWh
$6,800
-
kW-mo/yr
$(-543.0)
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $627 $100 $785
13,440
kWh
$442
-
kW-mo/yr
- - $(-400.0) $(-200.0)
04 2.4239: Eliminate or reduce compressed air usage $741 $2,535 $474
8,121
kWh
$267
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $5,111 $1,500 - - $5,111
-
MMBtu
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $323 $600 $184
3,159
kWh
$139
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,980 $19,622 $6,657
113,988
kWh
$3,753
-
kW-mo/yr
- - $(-795.0) $(-3,635.0)
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $496 - - $496
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $103,117 $274,657 $12,968
222,068
kWh
$133,835
-
kW-mo/yr
$4,568
-
MMBtu
$(-28,224.0)
-
MMBtu
$(-1,195.0) $(-18,835.0)
TOTAL IMPLEMENTED $13,383 $20,622 $7,822
133,947
kWh
$11,134
-
kW-mo/yr
$(-543.0)
-
MMBtu
- $(-1,195.0) $(-3,835.0)