ITAC Assessment: AR0086
ITAC logo
ITAC Assessment: AR0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Multi-Wall Paper Bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $1
M
to 5
M
# of Employees 115
Plant Area 140,000
ft2
Annual Production 18,200
ton
Production Hrs. Annual 5,735
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,820 2,192,556
kWh
Natural Gas $27,090 6,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,404 $421 $1,404
21,688
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $7,759 $1,780 $7,759
119,285
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,249 $320 $1,249
19,343
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,543 $160 $6,543
100,821
kWh
- -
05 2.4133: Use most efficient type of electric motors $5,105 $6,900 $5,105
78,546
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,128 - $2,128
32,825
kWh
- -
07 2.6218: Turn off equipment when not in use $3,671 $350 $3,423
52,755
kWh
$248
-
Tgal
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $24,232 $6,000 - - $24,232
-
lb
TOTAL RECOMMENDED $52,091 $15,931 $27,611
425,263
kWh
$248
-
Tgal
$24,232
-
lb
TOTAL IMPLEMENTED $42,928 $13,730 $18,448
284,290
kWh
$248
-
Tgal
$24,232
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs