ITAC Assessment: AR0084
ITAC logo
ITAC Assessment: AR0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Dock Levelers
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 49,540
ft2
Annual Production 21,000
pieces
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,143 720,399
kWh
Electricity Demand $10,797 2,802
kW-mo/yr
Natural Gas $8,017 1,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,999 $2,301 $6,384
82,943
kWh
$615
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $391 - $331
4,396
kWh
$60
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,517 $1,860 $1,253
16,413
kWh
$264
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $766 $200 $651
8,499
kWh
$115
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,982 $312 $1,972
25,498
kWh
$10
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,637 $500 $1,431
18,464
kWh
$206
-
kW-mo/yr
-
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $10,011 $1,000 - - $10,011
-
gal
TOTAL RECOMMENDED $23,303 $6,173 $12,022
156,213
kWh
$1,270
-
kW-mo/yr
$10,011
-
gal
TOTAL IMPLEMENTED $20,149 $3,813 $9,338
121,336
kWh
$800
-
kW-mo/yr
$10,011
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs