ITAC Assessment: AR0080
ITAC logo
ITAC Assessment: AR0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product 12,000 Btu Fuel
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 54,000
ft2
Annual Production 9,900,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,095 2,076,788
kWh
Electricity Demand $79,832 4,469
kW-mo/yr
Natural Gas $730 129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $4,133 $7,570 $1,418
67,409
kWh
$2,715
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,604 $364 $738
35,170
kWh
$866
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $6,114 $80 $1,279
61,254
kWh
$4,835
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $337 $100 $290
13,775
kWh
$47
-
kW-mo/yr
-
05 2.1114: Limit and control secondary combustion air in furnace $41,971 $11,500 $19,316
919,402
kWh
$22,655
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $608 - $153
7,327
kWh
$455
-
kW-mo/yr
-
07 3.5315: Lease / purchase baler; sell cardboard to recycler $24,144 $1,000 - - $24,144
-
lb
TOTAL RECOMMENDED $78,911 $20,614 $23,194
1,104,337
kWh
$31,573
-
kW-mo/yr
$24,144
-
lb
TOTAL IMPLEMENTED $78,911 $20,614 $23,194
1,104,337
kWh
$31,573
-
kW-mo/yr
$24,144
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs