ITAC Assessment: AR0076
ITAC logo
ITAC Assessment: AR0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bottled Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 2,607
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,460 3,439,625
kWh
Electricity Demand $117,652 7,971
kW-mo/yr
Natural Gas $77,020 28,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $10,799 $2,705 $5,136
160,610
kWh
$5,663
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,417 $2,610 $7,850
213,072
kWh
$5,567
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,150 $130 $690
21,688
kWh
$1,460
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $780 $50 $250
7,034
kWh
$530
-
kW-mo/yr
- - - -
05 2.2135: Repair and eliminate steam leaks $707 $160 - - $707
-
MMBtu
- - -
06 2.1223: Install smaller boiler (increase high fire duty cycle) $17,612 $28,000 - - $17,612
-
MMBtu
- - -
07 2.8112: Combine utility meters $1,845 $1,845 - $(-2,539.0)
-
kW-mo/yr
- - $4,384 -
08 3.4154: Eliminate leaks in water lines and valves $620 $140 - - - $517
-
Tgal
- $103
-
Tgal
09 3.3128: Utilize other methods to remove contaminants $11,168 $3,000 - - - $11,168
-
Tgal
- -
10 2.4133: Use most efficient type of electric motors $2,240 $3,440 $696
21,688
kWh
$1,544
-
kW-mo/yr
- - - -
11 2.8114: Change rate schedules or other changes in utility service $204 - - - - - $204 -
TOTAL RECOMMENDED $61,542 $42,080 $14,622
424,092
kWh
$12,225
-
kW-mo/yr
$18,319
-
MMBtu
$11,685
-
Tgal
$4,588 $103
-
Tgal
TOTAL IMPLEMENTED $42,085 $12,235 $14,622
424,092
kWh
$14,764
-
kW-mo/yr
$707
-
MMBtu
$11,685
-
Tgal
$204 $103
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs