| Assessment Year | 1995 |
|---|---|
| Principal Product | Steel Pipe Fittings |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
179,000
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 5,736
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,063,987 | 13,391,852 |
kWh
|
$0.079 |
| Natural Gas | $447,087 | 179,135 |
MMBtu
|
$2.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,081 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $80,081 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,733 | $6,574 |
$6,733
103,165
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $45,351 | $600 |
$45,351
730,657
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,657 | $650 |
$2,657
42,790
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $10,197 | $21,570 |
$10,197
150,352
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,681 | - |
$3,681
53,341
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $712 | $170 |
$712
7,620
kWh
|
- | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,750 | $11,000 | - |
$10,750
-
lb
|
|
| TOTAL RECOMMENDED | $80,081 | $40,564 |
$69,331
1,087,925
kWh
|
$10,750
-
lb
|
||
| TOTAL IMPLEMENTED | $80,081 | $40,564 |
$69,331
1,087,925
kWh
|
$10,750
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs