ITAC Assessment: AR0068
ITAC logo
ITAC Assessment: AR0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Poultry Meal
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 75,000
ft2
Annual Production 280,000
ton
Production Hrs. Annual 7,509
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,350,577 40,252,345
kWh
Natural Gas $3,709,937 1,476,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,425 $1,844 $1,425
41,911
kWh
- -
02 2.4133: Use most efficient type of electric motors $17,833 $39,950 $17,833
559,203
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,361 - $4,361
136,870
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $150,834 $4,000 - $150,834
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $17,600 $2,100 - $17,600
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $1,023 $250 $1,023
31,946
kWh
- -
07 2.8118: Check for accuracy of utility / power meters $31,656 $5,000 $31,656
-
kWh
- -
08 3.4151: Minimize water usage $3,519 $500 - - $3,519
-
Tgal
TOTAL RECOMMENDED $228,251 $53,644 $56,298
769,930
kWh
$168,434
-
MMBtu
$3,519
-
Tgal
TOTAL IMPLEMENTED $196,595 $48,644 $24,642
769,930
kWh
$168,434
-
MMBtu
$3,519
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs