Assessment Year | 1995 |
---|---|
Principal Product | Roofing Shingles and Rolls |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
144,200
ft2
|
Annual Production | 125,579
ton
|
Production Hrs. Annual | 2,503
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $165,040 | 2,967,175 |
kWh
|
$0.056 |
Natural Gas | $218,313 | 65,416 |
MMBtu
|
$3.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,994 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $999 | $410 |
$999
12,309
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $761 | $420 |
$761
8,499
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,192 | $10,190 |
$4,192
55,100
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,270 | - |
$1,270
15,826
kWh
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $1,054 | $1,000 | - |
$1,054
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,284 | $1,000 | - |
$2,284
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $705 | $250 |
$705
9,086
kWh
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $9,959 | $7,500 |
$9,959
138,628
kWh
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $824 | $50 |
$824
10,844
kWh
|
- | - | |
10 | 2.2515: Use optimum thickness insulation | $8,894 | $6,480 | - |
$8,894
-
MMBtu
|
- | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,827 | $12,500 | - | - |
$7,827
-
lb
|
|
12 | 3.7211: Modify material application methods | $26,000 | $3,000 | - | - |
$26,000
-
lb
|
|
TOTAL RECOMMENDED | $64,769 | $42,800 |
$18,710
250,292
kWh
|
$12,232
-
MMBtu
|
$33,827
-
lb
|
||
TOTAL IMPLEMENTED | $46,994 | $22,820 |
$18,710
250,292
kWh
|
$2,284
-
MMBtu
|
$26,000
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs