ITAC Assessment: AR0065
ITAC logo
ITAC Assessment: AR0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Roofing Shingles and Rolls
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 144,200
ft2
Annual Production 125,579
ton
Production Hrs. Annual 2,503
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,040 2,967,175
kWh
Natural Gas $218,313 65,416
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,994

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $999 $410 $999
12,309
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $761 $420 $761
8,499
kWh
- -
03 2.4133: Use most efficient type of electric motors $4,192 $10,190 $4,192
55,100
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,270 - $1,270
15,826
kWh
- -
05 2.2136: Install / repair insulation on steam lines $1,054 $1,000 - $1,054
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,284 $1,000 - $2,284
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $705 $250 $705
9,086
kWh
- -
08 2.4239: Eliminate or reduce compressed air usage $9,959 $7,500 $9,959
138,628
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $824 $50 $824
10,844
kWh
- -
10 2.2515: Use optimum thickness insulation $8,894 $6,480 - $8,894
-
MMBtu
-
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,827 $12,500 - - $7,827
-
lb
12 3.7211: Modify material application methods $26,000 $3,000 - - $26,000
-
lb
TOTAL RECOMMENDED $64,769 $42,800 $18,710
250,292
kWh
$12,232
-
MMBtu
$33,827
-
lb
TOTAL IMPLEMENTED $46,994 $22,820 $18,710
250,292
kWh
$2,284
-
MMBtu
$26,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs