Assessment Year | 1995 |
---|---|
Principal Product | Wood Furniture |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
108,000
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 2,086
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,650 | 1,369,871 |
kWh
|
$0.10 |
Natural Gas | $28,254 | 6,621 |
MMBtu
|
$4.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $929 | $160 |
$929
8,792
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,213 | $3,500 |
$5,213
54,220
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,879 | $643 |
$1,879
18,757
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,437 | $9,760 |
$4,437
41,325
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,343 | $400 |
$2,343
22,567
kWh
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,857 | $400 |
$20,857
-
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,746 | - |
$2,746
27,550
kWh
|
- | - | |
08 | 3.4151: Minimize water usage | $876 | $300 | - |
$696
-
Tgal
|
$180
-
Tgal
|
|
TOTAL RECOMMENDED | $39,280 | $15,163 |
$38,404
173,211
kWh
|
$696
-
Tgal
|
$180
-
Tgal
|
||
TOTAL IMPLEMENTED | $39,280 | $15,163 |
$38,404
173,211
kWh
|
$696
-
Tgal
|
$180
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs