| Assessment Year | 2003 |
|---|---|
| Principal Product | Electrical connectors |
| NAICS | 334417: Electronic Connector Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
63,000
ft2
|
| Annual Production | 910,000
pieces
|
| Production Hrs. Annual | 2,832
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $171,210 | 2,561,040 |
kWh
|
$0.067 |
| Electricity Demand | $24,977 | 8,885 |
kW-mo/yr
|
$2.81 |
| Electricity Fees | $212 | - |
|
- |
| Natural Gas | $1,424 | 259 |
MMBtu
|
$5.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,795 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,975 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $17,500 | $22,850 | n/a | - |
$17,500
-
kW-mo/yr
|
- |
| 02 | 2.7229: Air condition only space necessary | $9,640 | $190 |
$7,690
142,400
kWh
|
$1,950
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,150 | $200 |
$2,150
39,700
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $530 | $830 |
$330
6,140
kWh
|
$200
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $320 | $100 |
$320
6,000
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,655 | $560 |
$330
6,150
kWh
|
$65
-
kW-mo/yr
|
$2,260 | |
| TOTAL RECOMMENDED | $32,795 | $24,730 |
$10,820
200,390
kWh
|
$19,715
-
kW-mo/yr
|
$2,260 | ||
| TOTAL IMPLEMENTED | $14,975 | $1,780 |
$10,500
194,390
kWh
|
$2,215
-
kW-mo/yr
|
$2,260 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs