ITAC Assessment: AM0447
ITAC logo
ITAC Assessment: AM0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electrical connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 63,000
ft2
Annual Production 910,000
pieces
Production Hrs. Annual 2,832
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,210 2,561,040
kWh
Electricity Demand $24,977 8,885
kW-mo/yr
Electricity Fees $212 -
Natural Gas $1,424 259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $17,500 $22,850 n/a - $17,500
-
kW-mo/yr
-
02 2.7229: Air condition only space necessary $9,640 $190 $7,690
142,400
kWh
$1,950
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,150 $200 $2,150
39,700
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $830 $330
6,140
kWh
$200
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $320 $100 $320
6,000
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,655 $560 $330
6,150
kWh
$65
-
kW-mo/yr
$2,260
TOTAL RECOMMENDED $32,795 $24,730 $10,820
200,390
kWh
$19,715
-
kW-mo/yr
$2,260
TOTAL IMPLEMENTED $14,975 $1,780 $10,500
194,390
kWh
$2,215
-
kW-mo/yr
$2,260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs