ITAC Assessment: AR0060
ITAC logo
ITAC Assessment: AR0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bottled Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area 196,407
ft2
Annual Production 216,000,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,468 4,879,543
kWh
Natural Gas $77,759 15,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,989 $1,786 $10,989
180,832
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $13,123 $6,440 $13,123
217,175
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $854 $200 $854
14,361
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,132 $1,000 - $1,132
-
MMBtu
05 2.4133: Use most efficient type of electric motors $2,536 $3,550 $2,536
41,618
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,313 - $2,313
37,515
kWh
-
TOTAL RECOMMENDED $30,947 $12,976 $29,815
491,501
kWh
$1,132
-
MMBtu
TOTAL IMPLEMENTED $30,947 $12,976 $29,815
491,501
kWh
$1,132
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs