ITAC Assessment: AR0059
ITAC logo
ITAC Assessment: AR0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Paper Coating
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 300,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,580 5,109,906
kWh
Natural Gas $14,642 2,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,115 $554 $3,115
53,634
kWh
02 2.7111: Reduce illumination to minimum necessary levels $13,187 $3,130 $13,187
230,950
kWh
03 2.4133: Use most efficient type of electric motors $3,258 $3,820 $3,258
56,272
kWh
04 2.3212: Optimize plant power factor $2,940 $7,020 $2,940
-
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $623 - $623
10,844
kWh
06 2.4221: Install compressor air intakes in coolest locations $1,288 $200 $1,288
22,860
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $996 $300 $996
17,585
kWh
08 2.2511: Insulate bare equipment $7,225 $210 $7,225
123,681
kWh
TOTAL RECOMMENDED $32,632 $15,234 $32,632
515,826
kWh
TOTAL IMPLEMENTED $22,467 $8,004 $22,467
392,145
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs