ITAC Assessment: AR0050
ITAC logo
ITAC Assessment: AR0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Multiwall Bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 285,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,832 7,740,915
kWh
Natural Gas $170,171 74,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,999 $400 $8,999
262,896
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,361 $2,240 $1,361
38,394
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $988 $300 $988
36,342
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,207 $710 $3,207
93,787
kWh
- -
05 3.4151: Minimize water usage $4,887 $40 - $2,978
-
Tgal
$1,909
-
Tgal
TOTAL RECOMMENDED $19,442 $3,690 $14,555
431,419
kWh
$2,978
-
Tgal
$1,909
-
Tgal
TOTAL IMPLEMENTED $19,442 $3,690 $14,555
431,419
kWh
$2,978
-
Tgal
$1,909
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs