ITAC Assessment: AM0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product STREET LIGHTING STANDARDS
NAICS
n/a
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,946 1,438,453
kWh
Natural Gas $37,212 10,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $1,920 $4,700 - $1,920
-
MMBtu
02 2.6232: Install set-back timers $1,130 - $1,130
21,102
kWh
-
03 2.4312: Improve lubrication practices $561 - $561
9,086
kWh
-
04 2.2443: Re-use or recycle hot or cold process exhaust air $524 $1,092 - $524
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $345 - $345
7,327
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $308 $1,118 $308
4,689
kWh
-
07 2.6218: Turn off equipment when not in use $292 - $292
6,155
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $43 $65 $43
586
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $45 $5 $45
586
kWh
-
TOTAL RECOMMENDED $5,168 $6,980 $2,724
49,531
kWh
$2,444
-
MMBtu
TOTAL IMPLEMENTED $2,291 $1,118 $2,291
41,032
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs