ITAC Assessment: AR0048
ITAC logo
ITAC Assessment: AR0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Tool Chests
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 306,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,345 7,158,851
kWh
Natural Gas $170,171 74,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,366 $2,230 $1,366
40,739
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,500 $1,897 $6,500
184,642
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,952 $250 $4,952
203,986
kWh
04 2.4221: Install compressor air intakes in coolest locations $786 $300 $786
32,239
kWh
05 2.3212: Optimize plant power factor $6,929 $12,000 $6,929
-
kWh
TOTAL RECOMMENDED $20,533 $16,677 $20,533
461,606
kWh
TOTAL IMPLEMENTED $20,533 $16,677 $20,533
461,606
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs