ITAC Assessment: AR0044
ITAC logo
ITAC Assessment: AR0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Large Steel Valves
NAICS
n/a
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 3,200
pieces
Production Hrs. Annual 5,475
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,029 1,080,305
kWh
Natural Gas $19,278 3,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,019 $565 $3,019
38,394
kWh
02 2.7111: Reduce illumination to minimum necessary levels $588 $385 $588
7,327
kWh
03 2.4221: Install compressor air intakes in coolest locations $278 $100 $278
3,517
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $559 $100 $559
7,034
kWh
05 2.7212: Install or upgrade insulation on hvac distribution systems $196 $20 $196
2,345
kWh
TOTAL RECOMMENDED $4,640 $1,170 $4,640
58,617
kWh
TOTAL IMPLEMENTED $4,640 $1,170 $4,640
58,617
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs