ITAC Assessment: AR0039
ITAC logo
ITAC Assessment: AR0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Faucets
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 223
Plant Area 182,000
ft2
Annual Production 2,990,000
pieces
Production Hrs. Annual 4,589
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,678 4,472,450
kWh
Natural Gas $64,394 16,201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $3,542 $4,550 $3,542
47,186
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,553 $200 $1,553
20,516
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,580 $250 $3,580
47,479
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $3,612 $430 $3,612
48,066
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,738 $578 $2,738
36,342
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,302 $1,000 - $1,302
-
MMBtu
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,092 $750 $5,092
-
kWh
- -
08 2.4134: Replace electric motor with fossil fuel engine $26,724 $32,000 $44,088
585,873
kWh
$(-12,364.0)
-
MMBtu
$(-5,000.0)
TOTAL RECOMMENDED $48,143 $39,758 $64,205
785,462
kWh
$(-11,062.0)
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $21,419 $7,758 $20,117
199,589
kWh
$1,302
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs