Assessment Year | 1994 |
---|---|
Principal Product | Wood Furniture |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 698 |
Plant Area |
200,000
ft2
|
Annual Production | 341,500
pieces
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $605,246 | 15,396,249 |
kWh
|
$0.039 |
Natural Gas | $148,605 | 43,614 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,229 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,144 | $750 |
$2,144
55,100
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $5,939 | $8,697 |
$5,939
152,989
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $847 | $753 |
$847
21,395
kWh
|
- | - | |
04 | 2.4134: Replace electric motor with fossil fuel engine | $(-5,000.0) | $30,000 |
$27,547
715,123
kWh
|
$(-27,547.0)
-
MMBtu
|
$(-5,000.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,903 | $4,477 |
$8,903
227,433
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,412 | $550 |
$6,412
165,299
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $1,255 | $500 | - |
$1,255
-
MMBtu
|
- | |
08 | 2.7124: Make a practice of turning off lights when not needed | $1,729 | $100 |
$1,729
41,325
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,229 | $45,827 |
$53,521
1,378,664
kWh
|
$(-26,292.0)
-
MMBtu
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | $27,229 | $15,827 |
$25,974
663,541
kWh
|
$1,255
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs