ITAC Assessment: AR0031
ITAC logo
ITAC Assessment: AR0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated Paper-board Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 200,000
ft2
Annual Production 660,000
thousand feet
Production Hrs. Annual 6,570
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,777 4,949,004
kWh
Natural Gas $154,733 52,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,139

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,196 $250 $4,196
63,599
kWh
- -
02 2.2135: Repair and eliminate steam leaks $7,934 $1,000 - $7,934
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,963 $597 $1,963
29,601
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $5,155 $270 $5,155
77,960
kWh
- -
05 2.4133: Use most efficient type of electric motors $1,397 $2,720 $1,397
21,102
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $991 $100 $991
14,947
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $6,503 $1,000 - $6,503
-
MMBtu
-
08 2.4134: Replace electric motor with fossil fuel engine $24,683 $24,000 $37,512
568,288
kWh
$(-8,829.0)
-
MMBtu
$(-4,000.0)
09 2.2511: Insulate bare equipment $1,712 $1,204 - $1,712
-
MMBtu
-
TOTAL RECOMMENDED $54,534 $31,141 $51,214
775,497
kWh
$7,320
-
MMBtu
$(-4,000.0)
TOTAL IMPLEMENTED $28,139 $5,937 $13,702
207,209
kWh
$14,437
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs