Assessment Year | 1994 |
---|---|
Principal Product | Incandescent Light Bulbs |
NAICS |
n/a
|
SIC | 3641: Electric Lamp Bulbs and Tubes |
Sales Range | $50 M to 100M |
# of Employees | 540 |
Plant Area |
550,000
ft2
|
Annual Production | 220,000,000
pieces
|
Production Hrs. Annual | 6,883
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $945,021 | 15,303,928 |
kWh
|
$0.062 |
Natural Gas | $227,680 | 84,015 |
MMBtu
|
$2.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,649 | $300 |
$1,649
26,671
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,122 | $1,456 |
$3,122
50,410
kWh
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,184 | $725 |
$4,184
-
kWh
|
- | - | |
04 | 2.4134: Replace electric motor with fossil fuel engine | $107,965 | $66,000 |
$161,229
2,611,079
kWh
|
$(-38,264.0)
-
MMBtu
|
$(-15,000.0) | |
05 | 2.4133: Use most efficient type of electric motors | $7,343 | $9,530 |
$7,343
118,992
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $4,863 | $600 |
$4,863
78,839
kWh
|
- | - | |
TOTAL RECOMMENDED | $129,126 | $78,611 |
$182,390
2,885,991
kWh
|
$(-38,264.0)
-
MMBtu
|
$(-15,000.0) | ||
TOTAL IMPLEMENTED | $21,161 | $12,611 |
$21,161
274,912
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs