ITAC Assessment: AR0025
ITAC logo
ITAC Assessment: AR0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Incandescent Light Bulbs
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $50
M
to 100
M
# of Employees 540
Plant Area 550,000
ft2
Annual Production 220,000,000
pieces
Production Hrs. Annual 6,883
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $945,021 15,303,928
kWh
Natural Gas $227,680 84,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,649 $300 $1,649
26,671
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,122 $1,456 $3,122
50,410
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,184 $725 $4,184
-
kWh
- -
04 2.4134: Replace electric motor with fossil fuel engine $107,965 $66,000 $161,229
2,611,079
kWh
$(-38,264.0)
-
MMBtu
$(-15,000.0)
05 2.4133: Use most efficient type of electric motors $7,343 $9,530 $7,343
118,992
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $4,863 $600 $4,863
78,839
kWh
- -
TOTAL RECOMMENDED $129,126 $78,611 $182,390
2,885,991
kWh
$(-38,264.0)
-
MMBtu
$(-15,000.0)
TOTAL IMPLEMENTED $21,161 $12,611 $21,161
274,912
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs