Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Specialty Organic/Inorganic Chemicals
NAICS 325193: Ethyl Alcohol Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 155,480
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,672 3,325,728
kWh
Electricity Demand $96,366 6,756
kW-mo/yr
Natural Gas $570,011 56,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $18,706 - - - $18,706
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,807 $34,035 $5,482
304,563
kWh
$9,814
-
kW-mo/yr
- $511 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,936 $18,000 $14,936
266,718
kWh
- - - -
04 2.2424: Use heat in flue gases to preheat products or materials $11,027 $30,000 - - $11,027
-
MMBtu
- -
05 2.4322: Use or replace with energy efficient substitutes $10,968 $500 $6,880
122,880
kWh
$4,088
-
kW-mo/yr
- - -
06 3.4155: Meter waste water $10,810 - - - - - $10,810
07 2.2515: Use optimum thickness insulation $8,710 $4,000 - - $8,710
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,810 $4,500 $6,340
113,290
kWh
$1,470
-
kW-mo/yr
- - -
09 2.2424: Use heat in flue gases to preheat products or materials $6,163 $12,326 - - $6,163
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,746 $8,200 $3,758
23,108
kWh
- - - $(-12.0)
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,408 - $370
20,568
kWh
$1,038
-
kW-mo/yr
- - -
12 2.1223: Install smaller boiler (increase high fire duty cycle) $941 - - - $941
-
MMBtu
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $592 - $156
8,640
kWh
$436
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $111,624 $111,561 $37,922
859,767
kWh
$16,846
-
kW-mo/yr
$45,547
-
MMBtu
$511 $10,798
TOTAL IMPLEMENTED $49,318 $46,235 $9,610
348,239
kWh
$10,852
-
kW-mo/yr
$28,357
-
MMBtu
$511 $(-12.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs