Assessment Year | 2006 |
---|---|
Principal Product | Specialty Organic/Inorganic Chemicals |
NAICS | 325193: Ethyl Alcohol Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
155,480
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,672 | 3,325,728 |
kWh
|
$0.044 |
Electricity Demand | $96,366 | 6,756 |
kW-mo/yr
|
$14.26 |
Natural Gas | $570,011 | 56,617 |
MMBtu
|
$10.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $111,624 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $18,706 | - | - | - |
$18,706
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,807 | $34,035 |
$5,482
304,563
kWh
|
$9,814
-
kW-mo/yr
|
- | $511 | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,936 | $18,000 |
$14,936
266,718
kWh
|
- | - | - | - | |
04 | 2.2424: Use heat in flue gases to preheat products or materials | $11,027 | $30,000 | - | - |
$11,027
-
MMBtu
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $10,968 | $500 |
$6,880
122,880
kWh
|
$4,088
-
kW-mo/yr
|
- | - | - | |
06 | 3.4155: Meter waste water | $10,810 | - | - | - | - | - | $10,810 | |
07 | 2.2515: Use optimum thickness insulation | $8,710 | $4,000 | - | - |
$8,710
-
MMBtu
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,810 | $4,500 |
$6,340
113,290
kWh
|
$1,470
-
kW-mo/yr
|
- | - | - | |
09 | 2.2424: Use heat in flue gases to preheat products or materials | $6,163 | $12,326 | - | - |
$6,163
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,746 | $8,200 |
$3,758
23,108
kWh
|
- | - | - | $(-12.0) | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,408 | - |
$370
20,568
kWh
|
$1,038
-
kW-mo/yr
|
- | - | - | |
12 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $941 | - | - | - |
$941
-
MMBtu
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $592 | - |
$156
8,640
kWh
|
$436
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $111,624 | $111,561 |
$37,922
859,767
kWh
|
$16,846
-
kW-mo/yr
|
$45,547
-
MMBtu
|
$511 | $10,798 | ||
TOTAL IMPLEMENTED | $49,318 | $46,235 |
$9,610
348,239
kWh
|
$10,852
-
kW-mo/yr
|
$28,357
-
MMBtu
|
$511 | $(-12.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs