ITAC Assessment: AR0021
ITAC logo
ITAC Assessment: AR0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Boilers
NAICS
n/a
SIC 3440:
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 146,739
ft2
Annual Production 500
ton
Production Hrs. Annual 5,214
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,385 2,439,918
kWh
Natural Gas $63,512 15,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,260 $6,000 $16,260
-
kWh
02 2.2515: Use optimum thickness insulation $855 $100 $855
12,309
kWh
03 2.3212: Optimize plant power factor $20,139 $9,600 $20,139
-
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,558 $150 $1,558
22,567
kWh
05 2.3512: De-energize excess transformer capacity $3,017 $5,760 $3,017
19,930
kWh
06 2.4221: Install compressor air intakes in coolest locations $794 $300 $794
11,430
kWh
07 2.7111: Reduce illumination to minimum necessary levels $6,740 $790 $6,740
97,011
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,386 $822 $1,386
19,930
kWh
09 2.6218: Turn off equipment when not in use $1,947 - $1,947
28,136
kWh
TOTAL RECOMMENDED $52,696 $23,522 $52,696
211,313
kWh
TOTAL IMPLEMENTED $52,696 $23,522 $52,696
211,313
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs