ITAC Assessment: AM0976
ITAC logo
ITAC Assessment: AM0976
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Miles of maintained channels
NAICS 924110: Administration of Air and Water Resource and Solid Waste Management Programs
SIC 8231: Libraries
Sales Range $100
M
to 500
M
# of Employees 168
Plant Area 60,000
ft2
Annual Production 2,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,681 1,227,264
kWh
Electricity Demand $32,281 3,050
kW-mo/yr
Natural Gas $50,654 4,829
MMBtu
Waste Disposal Costs
Water Usage $3,231 1
Tgal
TOTAL YEARLY COSTS $170,847
RECOMMENDED SAVINGS* $83,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $64,229 $200,000 $38,069
551,730
kWh
- $26,160
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,343 $25,452 $4,156
60,235
kWh
$2,187
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,858 $6,672 $1,858
26,934
kWh
- -
04 2.9114: Use solar heat to make electricty $10,747 $115,440 $7,203
104,389
kWh
$3,544
-
kW-mo/yr
-
TOTAL RECOMMENDED $83,177 $347,564 $51,286
743,288
kWh
$5,731
-
kW-mo/yr
$26,160
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs