ITAC Assessment: AM0970
ITAC logo
ITAC Assessment: AM0970
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Turbine Bases and Tanks
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 335
Plant Area 1,893,796
ft2
Annual Production 100
units
Production Hrs. Annual 6,052
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,449 11,460,403
kWh
Electricity Demand $176,847 16,438
kW-mo/yr
Electricity Fees $25,226 -
Natural Gas $51,593 4,899
MMBtu
Waste Disposal Costs
Water Usage $34,517 8,625
Tgal
TOTAL YEARLY COSTS $1,020,632
RECOMMENDED SAVINGS* $133,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $84,460 $964,650 $84,460
823,460
kWh
- -
02 2.4314: Use synthetic lubricant $1,480 $2,740 $950
14,800
kWh
$530
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,810 $2,875 $10,450
163,200
kWh
$4,360
-
kW-mo/yr
-
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,116 $600 $1,720
26,882
kWh
$396
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $29,826 $86,260 - $29,826
-
kW-mo/yr
-
06 2.8123: Pay utility bills on time $952 - - - $952
TOTAL RECOMMENDED $133,644 $1,057,125 $97,580
1,028,342
kWh
$35,112
-
kW-mo/yr
$952
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs