ITAC Assessment: AM0944
ITAC logo
ITAC Assessment: AM0944
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical, pneumatic, and hydraulic actuators
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 240
Plant Area 190,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,900 5,567,350
kWh
Electricity Demand $128,120 12,531
kW-mo/yr
Electricity Fees $12,720 -
Natural Gas $3,740 370
MMBtu
Waste Disposal Costs
Water Usage $10,241 1,710
Tgal
TOTAL YEARLY COSTS $440,721
RECOMMENDED SAVINGS* $21,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $17,100 $216,980 $17,100
335,496
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,080 $1,194 $480
9,313
kWh
$600
-
kW-mo/yr
03 2.7423: Reduce heat gain by window tinting $2,210 $12,610 $1,950
37,540
kWh
$260
-
kW-mo/yr
04 2.7224: Reduce space conditioning during non-working hours $900 $822 $480
9,480
kWh
$420
-
kW-mo/yr
TOTAL RECOMMENDED $21,290 $231,606 $20,010
391,829
kWh
$1,280
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs